49th Annual Excellence in Concrete Construction Awards “Public Works-Renovation” Category Winner - WM Winkler
Wm. Winkler Co. US 195 Excelsior Road to Jct I-90 Lanes PCCP Rehab (WSDOT) Washington Aggregates & Concrete Association 49th Annual Excellence in Concrete Construction Awards “Public Works-Renovation” Category Winner
WmWinklerCo,Wm. Winkler Co.,Compacted Concrete Pavement,CCP,Concrete,Spokane,Newman Lake,Otis Orchards,Contractor,Conctractors,Sidewalk
15808
post-template-default,single,single-post,postid-15808,single-format-standard,ajax_fade,page_not_loaded,,qode-child-theme-ver-1.0.0,qode-theme-ver-9.2,wpb-js-composer js-comp-ver-4.11.2.1,vc_responsive

49th Annual Excellence in Concrete Construction Awards “Public Works-Renovation” Category Winner

49th Annual Excellence in Concrete Construction Awards “Public Works-Renovation” Category Winner

US 195 Excelsior Road to Jct I-90 Lanes PCCP Rehab (WSDOT)
Washington Aggregates & Concrete Association
49th Annual Excellence in Concrete Construction Awards
“Public Works-Renovation” Category Winner

Rehabilitation of 8.8 miles of two southbound lanes. The original constructed between 1954 and 1964. The fast track 80-day projects included 14,378 SY of panel replacement; 4,177 SY of panel jacking with chemical grout; 112,900 SY of PCC Pavement grinding; 214,559 LF of joint repair; 29,200 SY of micro milling bituminous paving; 2,902 SY asphalt shoulder; 58,400 SY slurry seal; 128,224 LF of pavement marking; appurtenances and traffic control.