Matsen Creek Emergency Landslide Repair - WM Winkler
Wm Winkler Company in conjunction with WSDOT/Eastern Region and Colville Maintenance successfully opened US HWY 395 at Matsen Creek in just 30 working days after a major landslide.
WmWinklerCo,Wm. Winkler Co.,Compacted Concrete Pavement,CCP,Concrete,Spokane,Newman Lake,Otis Orchards,Contractor,Conctractors,Sidewalk,Matsen Creek,Landslide Repair
15838
post-template-default,single,single-post,postid-15838,single-format-standard,ajax_fade,page_not_loaded,,qode-child-theme-ver-1.0.0,qode-theme-ver-9.2,wpb-js-composer js-comp-ver-4.11.2.1,vc_responsive

Matsen Creek Emergency Landslide Repair

Matsen Creek Emergency Landslide Repair

Emergency Slide Repair-Matsen Creek US 395 (2017)
(WSDOT/Eastern Region)

Wm Winkler Company in conjunction with WSDOT/Eastern Region and Colville Maintenance successfully opened US HWY 395 at Matsen Creek in just 30 working days after a major landslide. The project encompassed erosion control, geotechnical analysis, waste and tree removal, over 39,000 tons of imported structural fill, 12-foot diameter corrugated metal pipe, seeding, asphalt reconstruction, pavement marking and guardrail.

“Quite a feat and accomplishment in 30 days!
This is something to be proud of!”

Tom Brasch, PE
Project Engineer, WSDOT/Eastern Region

Landslide

Reconstruction